当前位置:网站首页 >> 作文 >> 最新cet6阅读真题实用

最新cet6阅读真题实用

格式:DOC 上传日期:2023-05-02 13:10:23
最新cet6阅读真题实用
时间:2023-05-02 13:10:23     小编:zdfb

无论是身处学校还是步入社会,大家都尝试过写作吧,借助写作也可以提高我们的语言组织能力。那么我们该如何写一篇较为完美的范文呢?下面我给大家整理了一些优秀范文,希望能够帮助到大家,我们一起来看一看吧。

cet6阅读真题篇一

where there is life, there is hope.以下是小编为大家搜索整理的大学英语cet6阅读练习题压轴预测,希望能给大家带来帮助!更多精彩内容请及时关注我们应届毕业生考试网!

in the last two hundred years there have been great changes in the method of production of goods. this is now also true of the building industry; for mechanization has been introduced. system building can save both time and money. the principle of system building is that the building is made from a set of standard units. these are either made at the building-site or at a factory. some designers, in fact, are standardizing the dimensions of rooms. they are made in multiples of a single fixed length, usually ten centimeters. this is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. the most important fact about system building is its speed. a ten-storey flat, for example, can be completed in four months.

there are several new methods of system building. one is the panel method. in this case, the construction company sometimes erects a factory on the site. the walls and floors of the building, called panels, are cast in a horizontal or vertical position. conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. the moulds for making these castings are situated all around the building.

after the concrete panels are cast, they are allowed to set and harden for a week. next they are lifted by a tower crane on to any section of the building. there the panels are cemented together at their joints and the floor covering is laid.

after the panels have been cemented together, the crane lifts a case into the area. it contains all the fittings to be installed, such as wash-basins, radiators and pipes. finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

in some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. a giant overhead crane is used to lift them into position. in the future, this method may become more widespread.

1. the main difference between panel method and the method discussed in the last paragraph is_______.

a. the latter uses ready-made internal features

b. panels are cast in a level position

c. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

d. the former is more expensive than the latter

2. which of these statements is true of system building?

a. it employs more men. b. it is difficult and dangerous.

c. it can save both time and money. d. it means less mechanization.

3. according to the passage, the principle of system building is that_______.

a. construction methods are safer

b. buildings are made from a set of standardized units

c. similar buildings can be produced

d. all units are produced on the site

4. the usual fixed length in the modular system is_______.

a. twenty centimeters b. ten millimeters

c. fifty centimeters d. ten centimeters

5. what lifts the concrete panels onto the building?

a. cranes. b. man-power.

c. pulleys. d. hydraulic jacks.

s("content_relate");

【大学英语cet6阅读练习题压轴预测】相关文章:

全国英语cet6听力题型压轴预测

08-24

商务英语bec中级阅读压轴预测

06-19

大学英语六级cet阅读试题压轴预测

06-17

最新雅思英语考试阅读压轴预测

08-24

最新大学cet6阅读理解完型填空压轴训练

08-25

大学生英语cet6阅读基础练习题

08-25

大学英语cet6阅读材料

06-03

大学英语六级考试阅读压轴预测试题

08-19

2017年托福阅读考试压轴预测

08-20

全文阅读已结束,如果需要下载本文请点击

下载此文档
a.付费复制
付费获得该文章复制权限
特价:5.99元 10元
微信扫码支付
已付款请点这里
b.包月复制
付费后30天内不限量复制
特价:9.99元 10元
微信扫码支付
已付款请点这里 联系客服